Translate

Wednesday 14 December 2016

Bridging the Gap! - Building Challenge #4

Students learned about tension and compression today. Using their desks and chairs, students had to build a bridge spanning a 30cm gap. Their bridges needed to hold a load - all groups were successful!  


Above: A great example of a pillar system
Below: A terrific design with some suspension 


No comments:

Post a Comment